4dP leads cross-functional, integrated project delivery teams to success.
MEP coordination for $62mm interior renovation project.. BIM Execution Plan, As built model, Engineering coordination, 12 month Clash Detection identified and cleared 100's of spatial conflicts.
BIM services, engineering coordination, routing systems design including security cells, Clash Detection for GC.
Headquarters Command and Control building for the 1st Armored Division. Solutions included cost-saving underground routing solutions, and clash detection.
All BIM and VDC completed for CornerCube, Inc.
$600mm luxury retail center. Complete BIM process drove Just-in-Time construction sequence for concrete structure, fenestration, and stone trim elements.
Partnered with Steel Detailer to provide fully coordinated Steel Shop Drawings driven by BIM. Clash detection provided for full MEP systems and steel frame.
BIM process found thousands of errors and omissions shop drawings. Changed overhead crane. Big savings!
Led multi-disciplinary team of engineers, contractors, building LDAC virtually prior to permit. BIM and renderings drove major design change, altering history.